
Gardens of the World – Berlin Ropeway
1.5 km long route, servicing 6000 passengers per hour. Each individual gondola required power to run a radio transmitter and loudspeaker. Installing a utility grid powerline was technically impossible. A quiet, clean, sustainable, compact solution that performs will in vibrating conditions was required.

Mazowe High School – Zimbabwe
The existing utility grid available to the secondary school provided intermittent power which created problems and frustrations for administrators, teachers, students, and their families. Stable power translates to improved student opportunity and performance and 45% savings on future energy bills.

Critical Monitoring – China
A custom designed charge controller, with custom branding, and unique screws for casing, to fit with the pre-defined parameters of this OEM customer. These autonomous, off-grid solar stations monitor weather conditions, water levels and other environmental conditions, requiring a charge controller well suited for harsh conditions. 2300+ installed units and counting.